| Location |
Dawson County, Texas |
| Work Performed |
Engineering and Design for the Addition of a 3,400HP Electric Drive CO2 Compressor |
| Year |
2007 |
| |
|
| |
|
| Location |
Pecos County, Texas |
| Work Performed |
Engineering and Design of an Acid Gas Injection System for a Gas Plant |
| Year |
2007 |
| |
|
| |
|
| Location |
West Texas and Eastern New Mexico |
| Work Performed |
Engineering Study and AFE Quality Estimate for Pipeline Upgrade |
| Year |
2007 |
| |
|
| |
|
| Location |
West Texas and Eastern New Mexico |
| Work Performed |
Field Records and Drafting of Production Facilities to support End Device Modifications |
| Year |
2007/2006 |
| |
|
| |
|
| Location |
Maverick County, Texas |
| Work Performed |
Engineering and Design of a Central Tank Battery |
| Year |
2007/2006 |
| |
|
| |
|
| Location |
Richland County , Montana |
| Work Performed |
Engineering, Design, and Drafting for a Major Gathering System Expansion |
| Year |
2004 to 2007 |
| |
|
| |
|
| Location |
Midland County, Texas |
| Work Performed |
Engineering and Design to Produce Field Record P&ID’s as Well as Piping and Electrical Drawings of a Chemical Plant |
| Year |
2006 |
| |
|
| |
|
| Location |
Kent County, Texas |
| Work Performed |
Engineer and Design of a Flare Knock-out Vessel and Related Equipment and Foundations |
| Year |
2006 |
| |
|
| |
|
| Location |
Regan County, Texas |
| Work Performed |
Engineering and Drafting for Upgrade of Three Pump Station as well as a New 12” Mainline and a 6” Delivery Line |
| Year |
2006 |
| |
|
| |
|
| Location |
Garvin County, Oklahoma |
| Work Performed |
SRU Structural Engineering and Design |
| Year |
2005 |
| |
|
| |
|
| Location |
Van Zandt County, Texas |
| Work Performed |
Drafting and Miscellaneous Engineering for a Refrigeration Plant |
| Year |
2005 |
| |
|
| |
|
| Location |
Bowman County , North Dakota |
| Work Performed |
Engineering and Drafting for Addition of a Tank and Two Pumps at an Existing Station |
| Year |
2004 |
| |
|
| |
|
| Location |
Pecos and Winkler Counties, Texas |
| Work Performed |
Pipeline Integrity Management Services |
| Year |
2004 |
| |
|
| |
|
| Location |
Lea Country, New Mexico |
| Work Performed |
Engineering and Drafting for Open and Closed Drain System |
| Year |
2002 |
| |
|
| |
|
| Location |
Harris County, Texas |
| Work Performed |
Engineering and Detail Design for a Water Coalescer Installation and Miscellaneous Engineering Assignments |
| Year |
2001 |
| |
|
| |
|
| Location |
Eddy County, New Mexico |
| Work Performed |
Engineering, Drafting and Electrical Termination at a Pump Station |
| Year |
1999 |
| |
|
| |
|
| Location |
Upton County, New Mexico |
| Work Performed |
Engineering and Inspection Services for Wind Turbine Project |
| Year |
1999 |